Pre-Demolition Surveys
It is very important to conduct a survey of buildings prior to their demolition. A survey must be conducted for all commercial buildings built prior to 1990 before demolition.
A hazardous materials survey must be conducted for all buildings built before 1990 that required demolition in accordance with workplace health and safety legislation and AS2601. This survey outlines all known hazardous materials that may require removal for safe and compliant demolition.
These hazards Include:
Asbestos
Mould and indoor air quality
Synthetic Mineral Fibre
PCB’s
Lead Paint
Ozone Depleting Substances
Chemical storage
Hazardous materials that are not identified prior to demolition have the potential to cause major safety issues to the site that may result in health and financial implications to the workers and project outcomes.
Call us on (07) 3191 4684 or make an enquiry to see how we can help you today.